Summarized for each user, they are the following:
Evacuation of a Port Authority Buiding: as established in the Building Emergency Action Plan.
Evacuation in some PORT AREA. According to the following table:
Area |
Meeting Point Alternative Meeting Point |
BOUZAS AND REPAIR DOCK |
Access control point to the dock GALICIAMAR Esplanade Descargar plano |
BEIRAMAR |
San Gregorio Curve Cannery Industry Square Parking Lot (Coruña Street Roundabout) Descargar plano |
BERBÉS |
Parking Lot next to the Lonja de Grandes Peces (Large Fish Market) Eduardo Cabello Pier Base Descargar plano |
CENTER |
Statue of the Swimmer - Ria Maritime Station Port Authority Session Building Descargar plano |
COMMERCIAL DOCKS |
Portalón Special Pieces (“Paellera”) Esplanade adjacent to the access control point to the docks ADIF gateway ("TECO")Descargar plano |
|
|
The EMERGENCY CHIEF may vary the meeting points depending on the type, location and evolution of the emergency.
MAKE SURE YOU KNOW THE LOCATION OF THE MEETING POINT FOR THR AREA YOU ARE IN
All drills must be communicated at least 72 hours in advance to the Control Center.
Port of Vigo Control Center
900 100 802