Fees applicable to services carried out at the Border INspection Post (BIP) new facilities. Year 2013
* At the meeting held by the Borad of Directors of this Port Authority on February 24, 2014, it was passed that fees for services provided at the Guixar Border Inspection post (BIP), have ZERO increase, with effects from February 1, 2014.
CONCEPT |
GOODS STORED IN PALLETS |
GOODS STORED IN BOXES |
LARGE FISH |
UNITS |
Container Unsealing and Opening for Inspections, and Subsequent Close and Sealing |
54,52 |
54,52 |
54,52 |
€ |
Presentation of the Container for Documentary and Sealing Check |
27,26 |
27,26 |
27,26 |
€ |
Unpacking and Packing Handling and Central Aisle Arrangement for Container Inspection |
11,19 |
17,40 |
21,12 |
€/tm |
Classification of the Goods in the Container at the Request of the Owner or his/her Representative |
8,39 |
13,06 |
15,85 |
€/tm |
Container Lightening and Goods Relocation in the New Equipment |
19,53 |
19,53 |
19,53 |
€/tm |
Arrival and Departure of the Cold Room or Storage Room |
6,20 |
7,46 |
8,70 |
€/tm |
BIP Placement |
60,43 |
60,43 |
60,43 |
€ |
Cold Maintenance |
6,20 |
6,20 |
6,20 |
€/tm/week |
Weighing Check |
1,86 |
1,86 |
1,86 |
€/tm |
Administrative Management |
14,91 |
14,91 |
14,91 |
€ |
In ordinary session held by the Board of Directors of the Port Authority last December 21, 2015 it was agreed to UPDATE THE PUBLIC CONTAINER TERMINAL FEES
TERMAVI MAXIMUM FEES |
2013 |
2016 |
||
---|---|---|---|---|
1 |
Loading/Unloading (From hold/deck to the dock and movement to the first zone/warehouse and vice versa on working days from 08:00 to 20:00) |
|||
|
1.A |
Full Containers 20’-40’ per Unit Euros |
122,47 |
121,37 |
|
1.B |
Empty Containers 20’-40’ per Unit Euros |
88,03 |
87,23 |
|
1.C |
Containers Measuring <1m. 20’-40’ Plus per Unit Euros |
25% |
25% |
|
1.D |
Containers Containing Explosives Plus per Unit Euros |
673,46 |
667,41 |
|
1.E |
Hatch Cover from Ship to Dock and Vice Versa per Unit Euros |
172,53 |
170,98 |
2 |
Container Removal through Dock on Board |
|||
|
2.A |
Full Containers |
99,50 |
98,61 |
|
2.B |
Empty Containers |
71,10 |
70,46 |
3 |
Transferring (from Hold/Deck to Dock and Movement to Warehouse and Vice Versa) |
|||
|
3.A |
Full Containers 20’/40’ (every movement) |
86,92 |
86,14 |
|
3.B |
Empty Containers 20’/40’ (every movement) |
72,40 |
71,75 |
4 |
Shipment and Delivery (working days from 08:00 to 20:00 container 20’-40’) |
|||
|
4.A |
Full Container per Unit Euros / on Lorry |
34,44 |
34,13 |
|
4.B |
Empty Container per Unit Euros / on Lorry |
22,97 |
22,76 |
|
4.C |
Full Container per Unit Euros / on Train |
30,62 |
30,34 |
|
4.D |
Empty Container per Unit Euros / on Train |
26,79 |
26,55 |
|
4.E |
Other Measures per Unit Plus |
25% |
25% |
|
4.F |
Security, Control and Surveillance of the Goods, per Full Container Euros ISPS |
8,50 |
8,42 |
5 |
Stopping/Delays after the Free Time Given |
|||
|
5.A |
Working Days per Hour and Worker Euros |
368,71 |
365,40 |
|
5.B |
Saturdays Morning, Night from 20:00 to 02:00 per Hour and Worker Euros |
498,94 |
435,00 |
|
5.C |
Saturdays Afternoon, Sundays, Holidays and Nights from 02:00 to 08:00 per Hour and Worker Euros |
532,58 |
527,79 |
6 |
Extra costs |
|||
|
6.A |
Nights from Monday to Friday Not Holiday 20:00-02:00 per Worker |
25% |
25% |
|
6.B |
Nights from Monday to Friday Not Holiday 02:00-08:00 per Worker |
45% |
45% |
|
6.C |
Saturdays from 08:00 to 14:00 per Worker |
25% |
25% |
|
6.D |
Saturdays from 14:00 to 20:00 per Worker |
45% |
45% |
|
6.E |
Saturdays from 20:00 to 04:00 Extra Hours to Finish the Ship |
1127,20 |
1117,07 |
|
6.F |
Sundays and Holidays from 08:00 to 14:00 per Worker |
45% |
45% |
|
6.G |
Sundays and Holidays from 14:00 to 04:00 Extra Hours to Finish the Ship |
1127,20 |
1117,07 |
7 |
Surface Occupation |
|||
|
7.A |
Applied for full and empty containers not occupied during 5 days. Until 10 days, per TEU and Day |
1,73 |
1,71 |
|
7.B |
After the 5th day the fee will be recalculated retroactively from the first day. More than 10 days, per TEU and day |
3,12 |
3,09 |
|
7.C |
Empty Containers, from the 31st onwards, per TEU and Day (Not Applicable Retroactively) |
4,00 |
4,00 |
8 |
Refrigerated Containers |
|||
|
8.A |
Connexions, Power and Control per Unit/Day Euros |
83,16 |
82,41 |
|
8.B |
Realization of Temperature File |
35,02 |
34,74 |
|
8.C |
Pre-trip Inspection Without Cleaning |
105,26 |
104,31 |
9 |
Other Issues |
|||
|
9.A |
Container Positioning/Removal in Terminal per Unit/Euros: FULL |
22,97 |
22,76 |
|
9.B |
Container Positioning/Removal in Terminal per Unit/Euros: EMPTY |
19,10 |
18,93 |
|
9.C |
Containers Checking. Per Unit/Euros |
10,54 |
10,45 |
|
9.D |
Minimum Movements per Call |
50 |
50 |