CONCEPT

GOODS STORED IN PALLETS

GOODS STORED IN BOXES

LARGE FISH

UNITS

Container Unsealing and Opening for Inspections, and Subsequent Close and Sealing

54,52

54,52

54,52

Presentation of the Container for Documentary and Sealing Check

27,26

27,26

27,26

Unpacking and Packing Handling and Central Aisle Arrangement for Container Inspection

11,19

17,40

21,12

€/tm

Classification of the Goods in the Container at the Request of the Owner or his/her Representative

8,39

13,06

15,85

€/tm

Container Lightening and Goods Relocation in the New Equipment

19,53

19,53

19,53

€/tm

Arrival and Departure of the Cold Room or Storage Room

6,20

7,46

8,70

€/tm

BIP Placement

60,43

60,43

60,43

Cold Maintenance

6,20

6,20

6,20

€/tm/week

Weighing Check

1,86

1,86

1,86

€/tm

Administrative Management

14,91

14,91

14,91

TERMAVI maximum Fees

In ordinary session held by the Board of Directors of the Port Authority last December 21, 2015 it was agreed to UPDATE THE PUBLIC CONTAINER TERMINAL FEES

TERMAVI MAXIMUM FEES

2013

2016

1

Loading/Unloading (From hold/deck to the dock and movement to the first zone/warehouse and vice versa on working days from 08:00 to 20:00)

 

 

1.A

Full Containers 20’-40’ per Unit Euros

122,47

121,37

 

1.B

Empty Containers 20’-40’ per Unit Euros

88,03

87,23

 

1.C

Containers Measuring <1m. 20’-40’ Plus per Unit Euros

25%

25%

 

1.D

Containers Containing Explosives Plus per Unit Euros

673,46

667,41

 

1.E

Hatch Cover from Ship to Dock and Vice Versa per Unit Euros

172,53

170,98

2

Container Removal through Dock on Board

 

 

2.A

Full Containers

99,50

98,61

 

2.B

Empty Containers

71,10

70,46

3

Transferring (from Hold/Deck to Dock and Movement to Warehouse and Vice Versa)

 

 

3.A

Full Containers 20’/40’ (every movement)

86,92

86,14

 

3.B

Empty Containers 20’/40’ (every movement)

72,40

71,75

4

Shipment and Delivery (working days from 08:00 to 20:00 container 20’-40’)

 

 

4.A

Full Container per Unit Euros / on Lorry 

34,44

34,13

 

4.B

Empty Container per Unit Euros / on Lorry 

22,97

22,76

 

4.C

Full Container per Unit Euros / on Train

30,62

30,34

 

4.D

Empty Container per Unit Euros / on Train 

26,79

26,55

 

4.E

Other Measures per Unit Plus

25%

25%

 

4.F

Security, Control and Surveillance of the Goods, per Full Container Euros ISPS

8,50

8,42

5

Stopping/Delays after the Free Time Given

 

 

5.A

Working Days per Hour and Worker Euros

368,71

365,40

 

5.B

Saturdays Morning, Night from 20:00 to 02:00 per Hour and Worker Euros

498,94

435,00

 

5.C

Saturdays Afternoon, Sundays, Holidays and Nights from 02:00 to 08:00 per Hour and Worker Euros

532,58

527,79

6

Extra costs

 

 

6.A

Nights from Monday to Friday Not Holiday 20:00-02:00 per Worker

25%

25%

 

6.B

Nights from Monday to Friday Not Holiday 02:00-08:00 per Worker

45%

45%

 

6.C

Saturdays from 08:00 to 14:00 per Worker

25%

25%

 

6.D

Saturdays from 14:00 to 20:00 per Worker 

45%

45%

 

6.E

Saturdays from 20:00 to 04:00 Extra Hours to Finish the Ship 

1127,20

1117,07

 

6.F

Sundays and Holidays from 08:00 to 14:00 per Worker

45%

45%

 

6.G

Sundays and Holidays from 14:00 to 04:00 Extra Hours to Finish the Ship 

1127,20

1117,07

7

Surface Occupation

 

 

7.A

Applied for full and empty containers not occupied during 5 days. Until 10 days, per TEU and Day 

1,73

1,71

 

7.B

After the 5th day the fee will be recalculated retroactively from the first day. More than 10 days, per TEU and day

3,12

3,09

 

7.C

Empty Containers, from the 31st onwards, per TEU and Day (Not Applicable Retroactively)

4,00

4,00

8

Refrigerated Containers

 

 

8.A

Connexions, Power and Control per Unit/Day Euros

83,16

82,41

 

8.B

Realization of Temperature File

35,02

34,74

 

8.C

Pre-trip Inspection Without Cleaning 

105,26

104,31

9

Other Issues

 

 

9.A

Container Positioning/Removal in Terminal per Unit/Euros: FULL

22,97

22,76

 

9.B

Container Positioning/Removal in Terminal per Unit/Euros: EMPTY

19,10

18,93

 

9.C

Containers Checking. Per Unit/Euros

10,54

10,45

 

9.D

Minimum Movements per Call

50